A camp property is not a house with more taps. Its buildings are classified by what they do and how many people they hold, and that classification reaches back into the water heating: the equipment, the venting, the combustion air and the inspection list.
Occupancy first
Before a unit is specified, the building's use is decided first — a bunkhouse, a kitchen, a bathhouse and a residence are different problems. On the county's commercial path, the design has to answer for the people the building is permitted to hold, not the number who happen to be there.
Getting this wrong is expensive after the fact: a system sized for a household in a building reviewed as commercial fails its inspection or its first busy weekend.
No slack in the season
A seasonal property has no quiet week to absorb a failure. Once people arrive, a failed heater is a service interruption with an audience.
That drives two design habits: valve every unit so one can be isolated, and keep the recovery margin above the peak rather than exactly at it.
Service during occupancy
Isolation makes most repairs possible while the building runs. Work that needs the water off — a tank replacement, a main-line repair — waits for the shoulder months, which is why those get booked early.
Permits
Applications go through Tuolumne County Building and Safety under the 2025 California Building Standards Code. The Building Division is at 48 Yaney Ave in Sonora, on 209-533-5637, with the portal for submissions.
Inspection requests go to 209-533-5940, before 3 p.m. on the working day before. Where a roof or vent penetration is involved, the parcel's snow load from the county's map viewer is the design figure.
Multiple buildings, one visit
A property with several buildings is served better by one planned visit covering all of them than by separate call-outs. That is how the pre-season commissioning is arranged, and it is how a repair visit picks up the small faults found along the way.