A new heater in Bumblebee is a delivery problem wrapped around a plumbing job. The unit, the venting parts and the pan all have to reach a building that is not on the highway, and that has to be agreed before the order is placed.
Plan the approach first
Ask what the last stretch is: paved or dirt, how steep, is there a gate, can a truck turn around, is there room to set a pallet down. Those answers decide the vehicle and the day.
In winter they decide whether the job happens at all — the county does not clear these side roads, and a grade that ices over is not something a loaded truck argues with.
Sizing for real occupancy
First-hour rating matters more than tank volume. How many showers at once, is there a tub, does a washer draw hot water, how many people at the busiest weekend of the year.
A unit sized for two will not serve a holiday house, and the shortfall shows up as a complaint about a heater that is working exactly as designed.
Venting and combustion air
A gas heater needs a flue that drafts and air to burn. In a tightly built cabin, the air path is the part that gets forgotten, and it is also an inspection item — combustion air and venting sit alongside strapping, relief-valve piping and clearances on the county's list.
The vent termination has to stay clear of winter accumulation. A flue buried under snow is a blocked appliance, whatever the thermostat says.
Fuel and supply
Propane where there is no main, electric where the service carries it. For propane, the tank and line are sized for the appliance; for electric, the panel is checked before a large unit is ordered.
The permit
Installation is permitted work under the 2025 California Building Standards Code. The application goes to the Building Division in Sonora through the county's portal, and the inspection is requested through a separate line.
After the install
On well water, the flush interval for the new unit is set by the supply. It is worth writing down at installation, because nobody remembers it two winters later.